– 11 –
8. Remove the two shipping braces from the end of the dual rinse section by
removing the three 5/16 bolts and associated hardware from each brace.
9. Reinstall the detachable leg section removed in step 1.
Positioning the Adjacent Load or Unload Sections
Move the adjoining (load or unload) section to within several inches of the prepared
end of the center section. Adjust the feet of the section adjacent to the leveled center
section so tank supports are the same height. Peel the protective paper from the
vinylfoamtapeandmovethesecondsectiontoitsnalposition.Beverycareful
thatmatingcomponentsconnectandttogetherproperly.
Leveling the Load and Unload Sections
The tank support rails should be level across the entire length of the machine (Fig.
2). Sections to be mated should be level front to back (Fig. 3).
All adjoining components of the two sections are exactly in line with each other.
Top corners of adjoining sections are the same height.
Joining the Sections Together
Usedriftpinstoaligntheholesinthehorizontalandverticalchamberangesof
the mated sections. Use C-clamps to hold the sections in position while bolting the
chamberfrontandbackangestogether.Exercisecaretoavoidtearingthefoam
tape seal.
Do not use a forklift directly on the machine frame or tank to move
or lift machine sections. Doing so may result in damage to the machine.
Secure the vertical frame corner posts together at two locations using the appropriate
hardware (Fig. 8).