7. Remove any packaging, tape, wire and bracing from each section. Remove all
rear and lower panels.
8. Verifythatshippingtapehasbeenremovedfromalloatsineachtankandthat
theoatsarefreetooperateproperly.
NOTE: Do no throw out any loose parts. These may be required for installation
or operation.
LOCATION
Allow adequate space for machine installation and operation. Place the machine
sectionsclosetotheirnalposition.Allowspacetoworkontheendsofthecenter
section.
Review, but do not remove tags or labels. Remove tags after installation is complete
Positioning the Center Section
Useachalklineontheoortoalignthemachinealongitscompletelength.
Witheachsectioninitsapproximatenalposition,determinewhichsectionisatthe
highpointintheoor.Machine assembly begins after the center section has
been leveled to a height that compensates for the oor height of the other
sections.
Leveling the Center Section
Leveling is an important installation function because it could affect door operation
and cause leaks once the machine is operating.
Level the center section along its length by opening the doors and placing a
level between the doors along the tank support rail (Fig. 2). Do not check level
on top of doors. Adjust the feet in or out as required to level.
Fig. 2