Hobart FT1000S-ER-BD Dishwasher User Manual


 
– 19 –
21. Loosen clamps securing rubber hoses to drain solenoid valve and rotate solenoid
valve 180 degrees. Retighten clamps.
22. Attach rubberhoses to plastic draintee and barbed ttingon master drain
assembly and tighten clamps. Ensure assembly matches correct diagram for
direction of unit (Fig. 18) and that the solenoid valve is installed correctly
for direction of drain water ow.
R - LL - R
Fig. 18
23. Attach drain solenoid valve bracket, removed in step 16, to the platform and
solenoid valve.
24. Remove two bolts, nuts, and washers attached to front of the load platform.
25. Insert drain pipe shipped with the machine (00-948761-00007) into the plastic
drain tee on the master drain assembly.
26. Attach master drain assembly and platform to the load end of the machine by
sliding platform into the load end so that the drain pipe slips into the plastic drain
tee. Ensure that the platform rests on top of the frame channel below the
tee and that the front edge of the platform hooks over top of the front rail
support. Reattach the two bolts, washers, and nuts to front of the platform
removed in step 24.
27. Secure platform to frame channels with hardware removed in step 4.
28. Attach drain handle weldment to bottom of master drain assembly with the
nut removed in step 2. Ensure that the handle sits above the drain handle
support bracket.