Turbo Chef Technologies NGC-1007 Oven User Manual


 
SHUNT CAVITY/PLATE
Tightening Sequence
SHUNT ASSY/DOOR COVER
Tightening Sequence
5
84159
11
10 6237
12
14
15
13
16
14
8
1
15
9
10
16623717
11
12
13
4
FIGURE 36: Oven Door Assembly: Tightening Specs
Critical Adjustment Notes (Figure 35)
1. Orient with the gasket seam at the bottom of
the door assembly. Gasket should be straight
with no twists or pinching.
2. Attach insulation (Item 94) to the inside of the
door cover using aluminum tape (Item 98).
x
DO NOT block openings at bottom.
3. Item 94 (insulation) not shown for clarity.
4. Door should be flat without twisting or
warpage after tightening all hardware.
5. Refer to the chart to the right for torque specs.
Refer to Figure 36, above, for tightening
sequences.
6. Attach Item 99 with adhesive backing using
the two locating holes on the front cover.
PART TORQUE
VALUE
90. Bolt, 1/4”-20 x 1.00 80 In-Lbs
(9.04 Nm)
85. Nut, Keps #8-32
(Assembled by factory)
21 In-Lbs
(2.37 Nm)
96. Screw, 8-32 x 3/8”
Torx Security
21 In-Lbs
(2.37 Nm)
97. Screw, 8 x 1/2” PTH
21 In-Lbs
(2.37 Nm)
SCREW TORQUE CHART
Refer to Figures 35, 36.
THE OVEN DOOR
45