Vulcan-Hart SG4C ML-114876 Convection Oven User Manual


 
— 9 —
LEDOM
ATADSAG
LACIRTCELE
ATAD
RH/TUBTUPNIERUSSERPDLOFINAMENILPMA
larutaNenaporPlarutaNenaporPstloV021
C/D4GS
C/D6GS
000,06000,06"5.3"01spmA9
C/D44GS
C/D66GS
000,021000,021"5.3"01spmA81
The manual gas valve, located behind the small door in the lower front panel, should remain off until
all electrical and gas connections are made and the ovens are ready to be used.
LEVELING
Ensure that the oven racks are level in the final installed position. If the oven is installed on legs, turn
the adjustable feet in or out to level the oven front-to-back and side-to-side.
ELECTRICAL CONNECTIONS
WARNING: ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY WITH THE
APPLICABLE PORTIONS OF THE NATIONAL ELECTRICAL CODE AND/OR OTHER LOCAL
ELECTRICAL CODES.
WARNING: APPLIANCES EQUIPPED WITH FLEXIBLE ELECTRICAL POWER SUPPLY CORD
ARE PROVIDED WITH A THREE-PRONG GROUNDING PLUG. IT IS IMPERATIVE THAT THIS
PLUG BE CONNECTED INTO A PROPERLY GROUNDED THREE-PRONG RECEPTACLE. IF THE
RECEPTACLE IS NOT THE PROPER GROUNDING TYPE, CONTACT AN ELECTRICIAN. DO NOT
REMOVE THE GROUNDING PRONG FROM THIS PLUG.
The SG series ovens are equipped with a 120 volt / 60 Hz. / 1 phase cord and plug.
Refer to the Installation Codes and Standards section of this manual.
A schematic decal is located on the inside of the right side panel.
GAS AND ELECTRICAL DATA
3.5" (0.87 kPa) 10" (2.49 kPa)
3.5" (0.87 kPa) 10" (2.49 kPa)