6
6.0"
MIN.
6.0"
MIN.
6.0"
MIN.
DO NOT REMOVE
INITIAL SETUP
CAUTION – The dispenser is very heavy! Use care when lifting or moving it. Use at least two people to lift or
move the dispenser.
1. Set the dispenser on the counter where it will be used. The CDS-3 dispenser requires a minimum of 6.0”
air clearance on both sides and at the rear of the dispenser. For optimum performance, do not let warm air
from surrounding machines blow on the CDS-3 and DO NOT REMOVE VINYL DEFLECTOR.
NOTE – The dispenser should be level or slightly lower in front for proper operation.
Vinyl Deflector
6. Press the seals firmly into
place.
7. Apply a thin film of lubricant to
the inside of each auger shaft
seal.
8. Install the seals on the auger
shafts. Wipe the cooling drums
to remove any lubricant.
3. Squeeze some lubricant into
hand.
4. Apply a thin film of lubricant to
each cooling drum seal.
5. Install the seal over the flange
at the rear of each cooling drum
as shown.
2. Remove all shipping material, including the compressor support eye-bolts, the cooling drum supports, the
“Do Not Lift Here” signs from the cooling drums, and the “Rinse Before Using” signs from each hopper.
NOTE – Use BOM M2550.0000 lubricant where specified.
27646 022500