Page 31
SERVICE (cont.)
SOLENOID VALVE (Refill) (cont.)
P1107
9. Slide flow control bracket and solenoid as an
assembly over flow control and secure with four
#8-32 screws to the support bracket.
10. Securely fasten the water lines to and from the
solenoid valve and flow control.
11. Refer to Fig. 24 when reconnecting the wires.
WHI to Level Control Board T3
(120/208V, 120/240V Electro/Mechanical)
or WHI to DBC Board J1-5
RED to Level Control Board T3 (200 or 240V Electro/
Mechanical) or RED to DBC Board J1-5 (200V or 240V)
VIO to Level Control Board T1 (Electro/Mechanical)
or WHI/BLU to DBC Board J1-23
27362 092900
FIG. 24 REFILL SOLENOID TERMINALS