Dimensions
and Weights
UNT-PRC001-EN74
Basic Series
With Plenum
Note:
1. The condensate drain connection is always on the right hand side of the unit as shown.
2. Coil connections are
5
/8" OD sweat.
CS - Cooling coil supply
CR - Cooling coil return
HS - Heating coil supply
HR - Heating coil return
3. All duct collar dimensions are to the outside of the collar.
Unit
Size 04 06 08
A 1’-8
11
/16” 2’-6
3
/16” 3’-2
11
/16”
B1’-8
1
/2” 2’-6” 3’-2
1
/2”
C1’-8
5
/16” 2’-5
13
/16” 3’-2
5
/16”
D1’-10
3
/16” 2’-7
11
/16” 3’-4
3
/16”
E2’-4
1
/4” 3’-1
3
/4” 3’-10
1
/4”
Basic Unit With Plenum,
Model P