OV500 SERIES RACK OVEN - REMOVAL AND REPLACEMENT OF PARTS
8. Install lower actuator arm pin through lift pin.
9. Position the rack rotator assembly so the top
actuator mounting brackets will align with the
rotator assembly.
10. Reconnect lead wires.
11. Put oven into use and check for proper
operation.
CONVECTION BLOWER/MOTOR
NOTE: To follow this procedure, there must be 24''
of clearance at the top of the oven. If not, the blower
wheel must be accessed thru the heat exchanger
compartment.
A. CHECK ALL JOINTS PRIOR TO THE
GAS VALVE (SOLENOID) BEFORE
LIGHTING UNIT.
B. CHECK ALL JOINTS AFTER TO THE
GAS VALVE (SOLENOID) AFTER THE
UNIT IS LIT.
1. If necessary, move the gas line out of the way.
2. Shut off water supply line and remove exterior
water supply that is within the boundary of
blower cover.
3. Disconnect lead wires at motor junction box.
4. Remove motor junction box.
5. Remove probe cover and any existing probes.
6. Remove blower cover supports.
7. Remove blower cover.
8. Remove insulation.
9. Remove screws from blower mounting
assembly and remove complete blower
assembly.
10. Loosen set screws in blower wheel hub.
11. Remove retaining ring from shaft.
12. Remove blower wheel from motor shaft.
13. Remove screws securing motor mounting
bracket and remove motor assembly.