27
Model C300 Operating P rocedures
Note: The position of the handle on the syrup
sampling valve determines the direction of product
flow . The down position opens the syrup sampling
valve for collecting brix samples. The center position
shuts off t he product flow. The up position directs
the flow of product to t he freezing cylinder.
Step 11
Place a pail beneath the door spout. Open the draw
valve and drain the freezing c ylinder to remove any
incorrectly brixed product. Close the draw valve.
Step 12
Slowly open the p rime plug.
Step 13
Press the PRIME (+ + +) key. Allow the liquid level
to fill to the prime plug hole.
Step 14
Press the OFF (<- - ) k ey and close the prime plug.
Repeat Steps 1 through 14 for the other freezing
cylinder.
Step 15
To plac e the freezing cylinders in the AUTO mode,
press the AUTO (- - >) k ey on both sides. When the
unit cycles off, the product will be at serving
viscosity.
Figure 40
Step 16
Close the lighted display when c omplete. Replace
the panels and attach with screws. Install the front
drip tray and the splash shield on the front of the
freezer.
Figure 41
120 Day Closing Procedure
We recommend that the machine be completely
disassembled and cleaned at least e very 120 days
using the following procedures.
ALWAYS FOLLOW LOCAL HEALTH CODES
To dis assemble the Model C300, the following items
will be needed:
S T wo cleaning pails
S Necessary brushes (provided with freezer)
S Cleaner
S Single s ervice towels