41
Models C708 & C716 Operating Procedures
100507
Step 4
Install the pump assembly at the rear of the mix
hopper. To position the pump on the drive hub, align
the drive hole in the pis ton with the drive crank of
the drive shaft. Secure the pump i n place by slipping
the pump clip ov er the c ollar of the pump, making
sure the clip fits into the grooves in the collar.
(See Figure 44.)
Figure 4 4
Step 5
Install the pump end of the mix feed
tube and secure with the cotter pin. Failure to
follow this instruction could result in sanitizer
spraying on the operator. (See Figure 45.)
Figure 4 5
Step 6
Prepare another pail of approved 100 P PM sanitiz-
ing solution (examples: 2-1/2 gal. [9.5 liters] of
Kay-5R or 2 gal. [7.6 liters] of Stera-SheenR).
USE WARM WATER AND FOLLOW THE MANU-
FACTURER'S SPECIFICATIONS.
Step 7
Pour the sanitizing solution into the mix hopper.
Step 8
Brush the exposed s ides of t he hopper.
Step 9
Place the power switch in the ON position.
Step 10
Touch the WASH symbol
. This will cause the
sanitizing solution in the freezing cylinder to be
agitated. Wait at least 5 minutes before proceeding
with these instructions.
Step 11
With a pail beneath the door spout(s), open the draw
valve and touch the P UMP symbol
. Open and
close the draw valve 6 times.
Note: Momentarily open the center draw v alve to
sanitize the center door spout (C716 only ).
Draw off the remaining sanitizing solution.
Step 12
Touch the WASH and PUMP symbols
and
close the draw valve. (See Figure 46.)
Figure 4 6
Note: Be sure your hands are clean and
sanitized before going on in these instructions.