INITIAL START-UP CHECKLIST FOR
17/19EX CENTRIFUGAL LIQUID CHILLER
(Remove and use for job file.)
MACHINE INFORMATION:
NAME JOB NO.
ADDRESS MODEL
CITY STATE ZIP S/N
DESIGN CONDITIONS:
TONS BRINE
FLOW
RATE
TEMPERATURE
IN
TEMPERATURE
OUT
PRESSURE
DROP
PASS
SUCTION
TEMPERATURE
CONDENSER
TEMPERATURE
COOLER ******
CONDENSER ******
COMPRESSOR: Volts RLA OLTA
STARTER: Mfg Type
OIL PUMP: Volts RLA OLTA
REFRIGERANT: Charge Lbs
CARRIER OBLIGATIONS: Assemble ...............YesⅪ No Ⅺ
Leak Test ...............YesⅪ No Ⅺ
Dehydrate ...............YesⅪ No Ⅺ
Charging ................YesⅪ No Ⅺ
Alignment ...............YesⅪ No Ⅺ
Operating Instructions
Hrs.
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP
INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions .........................YesⅪ No Ⅺ
2. Machine Assembly, Wiring and Piping Diagrams ............YesⅪ No Ⅺ
3. Starting Equipment Details and Wiring Diagrams ............YesⅪ No Ⅺ
4. Applicable Design Data (see above) ......................YesⅪ No Ⅺ
5. Diagrams and Instructions for Special Controls .............YesⅪ No Ⅺ
INITIAL MACHINE PRESSURE:
YES NO
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
CHECK COMPRESSOR OIL LEVEL AND RECORD:
ADD OIL: Yes Ⅺ No Ⅺ
Amount:
RECORD PRESSURE DROPS: Cooler Condenser
CHARGE REFRIGERANT: Initial Charge Final Charge After Trim
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2 2
Tab 5a 5d
PC 211 Catalog No. 531-715 Printed in U.S.A. Form 17/19EX-1SS Pg CL-1 9-95 Replaces: 19EX-1SS