Before Initial Start-Up
Job Data Required
• list of applicable design temperatures and pressures (product data submittal)
• machine certified prints
• starting equipment details and wiring diagrams
• diagrams and instructions for special controls or options
• 19XL Installation Instructions
• pumpout unit instructions
Equipment Required
• mechanic’s tools (refrigeration)
• digital volt-ohmmeter (DVM)
• clamp-on ammeter
• electronic leak detector
CAUTION
CAUTION
!
Do not reset starter loads or any other starter safety for 30 seconds after the
compressor has stopped. Voltage output to the compressor start signal is main-
tained for 10 seconds to determine starter fault.