Contents
Charge Refrigerant into Machine
19XL Machine Equalization without Pumpout Unit
19XL Machine Equalization with Pumpout Unit
Trimming Refrigerant Charge
Initial Start-Up
Preparation
Manual Operation of the Guide Vanes
Dry Run to Test Start-Up Sequence
Check Rotation
If Rotation Is Proper
If the Motor Rotation Is Not Clockwise
Notes on Solid-State Starters (Benshaw, Inc.)
Check Oil Pressure and Compressor Stop
Calibrate Motor Current Demand Setting
To Prevent Accidental Start-Up