Carrier PC211 Refrigerator User Manual


 
INITIAL START-UP CHECKLIST FOR
19XL HERMETIC CENTRIFUGAL LIQUID CHILLER
(Remove and use for job file.)
MACHINE INFORMATION:
NAME JOB NO.
ADDRESS MODEL
CITY STATE ZIP S/N
DESIGN CONDITIONS:
TONS BRINE
FLOW
RATE
TEMPERATURE
IN
TEMPERATURE
OUT
PRESSURE
DROP
PASS
SUCTION
TEMPERATURE
CONDENSER
TEMPERATURE
COOLER ******
CONDENSER ******
COMPRESSOR: Volts RLA OLTA
STARTER: Mfg Type
OIL PUMP: Volts RLA OLTA
CONTROL/OIL HEATER: Volts M 115 M 230
REFRIGERANT: Type:
Charge
CARRIER OBLIGATIONS: Assemble ...............YesM No M
Leak Test ...............YesM No M
Dehydrate ...............YesM No M
Charging ................YesM No M
Operating Instructions
Hrs.
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP
INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions .........................YesM No M
2. Machine Assembly, Wiring and Piping Diagrams ............YesM No M
3. Starting Equipment Details and Wiring Diagrams ............YesM No M
4. Applicable Design Data (see above) ......................YesM No M
5. Diagrams and Instructions for Special Controls .............YesM No M
INITIAL MACHINE PRESSURE:
YES NO
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
CHECK OIL LEVEL AND RECORD: A
E
ßßß ßßß ßßß ßß
F
B
E
ßßß ßßß ßßß ßß
F
ADD OIL: Yes M No M
Amount:
RECORD PRESSURE DROPS: Cooler Condenser
CHARGE REFRIGERANT: Initial Charge Final Charge After Trim
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2
Tab 5a
PC 211 Catalog No. 531-945 Printed in U.S.A. Form 19XL-3SS Pg CL-1 12-94 Replaces: 19XL-2SS