5 - 62
5.5 Opening the Project
3 Confirmation dialog box is displayed. (The dialogue box is not displayed if GT SoftGOT1000 is already
in online mode.)
4 Selecting starts monitoring of the project monitored previously.
(Displays the Utility when opening a project for the first time.)
Turn off the power supply to the PLC or disconnect the communication cable that connects the personal
computer and PLC in advance if it is not desired to go into online mode with the previous project data or
if it is desired to open a project in off-line mode.
Yes