5 - 2
5.2 Communication Setup
5.2.1 Communication setup dialog box
5.2 Communication Setup
In Communication Setup, set the type of the PLC CPU to be connected, the communication time-out period,
etc.
1 Perform either of the following operations.
• Clicking (Communication Setup)
• Select [Online] [Communication Setup] from the menu.
• Right-click the mouse to select [Communication Setup] from the menu.
2 The Communication Setup dialog box is displayed.
3 Set each item and click the button.
Communication Setup
Make Communication Setup before starting monitoring.
After start of monitoring on GT SoftGOT1000, Communication Setup cannot be
changed.
(The "Communication Error Dialog" setting can be changed during monitoring.)
5.2.1 Communication setup dialog box
OK