Mitsubishi Electronics sw1dnd-iqwk-e Frozen Dessert Maker User Manual


 
3 - 44
3 OPERATING PROCEDURE OF MELSOFT NAVIGATOR
iQ Works
(From the previous page)
10. MT Developer2 is activated and the
message shown on the left is
displayed.
Read the message and click the
button.
11. The "Basic Setting" dialog box is
displayed.
Click the button to display
the "Open Project" dialog box.
12. Check that the project name allocated
to the CPU No. 1 is selected, and click
the button.
13. The message shown on the left is
displayed.
Read the message and click the
button to utilize the multiple CPU
parameter of CPU No.1 for CPU No. 2.
Click