Mitsubishi Electronics sw1dnd-iqwk-e Frozen Dessert Maker User Manual


 
3 - 55
1
OVERVIEW
2
SCREEN
CONFIGURATION
3
OPERATING PROCEDURE
OF MELSOFT NAVIGATOR
4
USING SYSTEM
LABELS
5
CREATING SYSTEM
BACKUP DATA
6
USING PROGRAM
JUMP FUNCTION
3.9 Reading/Writing/Verifying Controller Data
GOT projects
Read/write/verify GOT project data.
1. On the System Configuration window,
right-click the controller to which a GOT
project is allocated, and select [Online]
⇒ [Read]/[Write]/[Verify] in the shortcut
menu.
The screen image on the left shows the
case when [Write] is selected. Perform the
same operation for [Read] and [Verify].
2. The "Communicate with GOT" dialog
box is displayed.
For operating the "Communicate with
GOT"
dialog box, refer to the following
manuals.
GT Designer3 Version 1 Screen
Design Manual (Fundamentals)
GT Designer3 (GOT2000) Screen
Design Manual
Connection manuals for GOT1000
series
(Mitsubishi Products),
(Non-Mitsubishi Products 1),
(Non-Mitsubishi Products 2),
(Microcomputer, MODBUS Products,
Peripherals)
Connection manuals for GOT2000
series
(Mitsubishi Products),
(Non-Mitsubishi Products 1),
(Non-Mitsubishi Products 2),
(Microcomputer, MODBUS Products,
Peripherals)
GT Simulator3 Version 1 Operating
Manual
GT SoftGOT1000 Version 3
Operating Manual
GT SoftGOT2000 Version1 Operating
Manual
Select