Mitsubishi Electronics sw1dnd-iqwk-e Frozen Dessert Maker User Manual


 
3 - 53
1
OVERVIEW
2
SCREEN
CONFIGURATION
3
OPERATING PROCEDURE
OF MELSOFT NAVIGATOR
4
USING SYSTEM
LABELS
5
CREATING SYSTEM
BACKUP DATA
6
USING PROGRAM
JUMP FUNCTION
3.9 Reading/Writing/Verifying Controller Data
3.9 Reading/Writing/Verifying Controller Data
This section explains a method for reading/writing/verifying project data (programmable controller project,
motion controller project, GOT project).
Programmable controller projects
Read/write/verify programmable controller project data.
1. On the System Configuration window,
right-click the controller to which a
programmable controller project is
allocated, and select [Online]
[Read]/[Write]/[Verify] in the shortcut
menu.
The screen image on the left shows the
case when [Write] is selected. Perform the
same operation for [Read] and [Verify].
2. The "Online Data Operation" dialog box
is displayed.
For operating the "Online Data Operation"
dialog box, refer to the following manuals.
GX Works2 Version 1 Operating
Manual (Common)
GX Works2 Version 1 Operating
Manual (Simple Project)
GX Works2 Version 1 Operating
Manual (Structured Project)
GX Works2 Beginner's Manual
(Simple Project)
GX Works2 Beginner's Manual
(Structured Project)
Select