Mitsubishi Electronics SW2D5C-GTWK2-E Frozen Dessert Maker User Manual


 
5 - 50
5.2 Communication Setup
5.2.6 How to Set Up the YASKAWA PLC Connection
(1) Before setting
(a) Communication precautions
Only communications within the same segment are applicable.
Communications via a router or a gateway are not applicable.
A connection of multiple pieces of network equipment (including GT SoftGOT1000) to a
segment may increase the network load and slow down the communication between the GT
SoftGOT1000 and the programmable controller.
Communication efficiency may be improved by using one or more of the following methods:
Use a switching hub
Use a high-speed 100BASE-TX (100Mbps)
Reduce the number of monitoring points of the GT SoftGOT1000
To connect multiple GT SoftGOT1000 modules within the Ethernet network, set a different
[PLC No.] for each GT SoftGOT1000.
Do not use "192.168.0.18" for IP address when starting multiple GT SoftGOT modules.
Otherwise, a communication error occurs in GOT.
(2) Compatible models
(3) Setting of programmable controller side
For settings for each part of programmable controller, refer to the following manual.
GOT1000 Series Connection Manual
(4) Setting on the personal computer
Set the IP address.
(5) Communications check
(a) Ping test
Execute the Ping command with Command Prompt of Windows when the preparations for
communication are complete.
When the Ping test is verified
C:\>Ping 192. 168. 0. 2
Reply from 192.168.0.2:bytes=32 time<10ms TTL=32
When the Ping test is not verified
C:\>Ping 192. 168. 0. 2
Request timed out.
If the Ping test is not verified, check connections of the cable and unit, Windows side IP
address and other settings.
(b) Station monitoring function
For details on the station monitoring function, refer to the following manual.
GOT1000 Series Connection Manual
Models
218IF, 218IF-01