Emerson Process Management 3-9000-745 Wok User Manual


 
User Manual MON20/20 Software for Gas Chromatographs
3-9000-745 SEPTEMBER 2010
4-78
4. To save the changes without closing the window, click Save. To save
the changes and close the window, click OK.
4.10.4 Changing the base pressure for a stream
To change the base pressure for a stream, do the following:
1. Select Streams... from the Application menu. The Streams window
opens.
Figure 4-68. The Streams window
2. For the appropriate stream, double-click on the corresponding cell
under the Base Pressure column and enter an new value.
3. To save the changes without closing the window, click Save. To save
the changes and close the window, click OK.
4.11 Creating a stream sequence for a detector
A stream sequence defines the order of stream analysis for a detector. To
create or edit a stream sequence, do the following:
1. Select Stream Sequence... from the Application menu. The Stream
Sequence window displays.