Mitsubishi Electronics SW1-GTD2-O-E Frozen Dessert Maker User Manual


 
5 - 23 5 - 23
5.2.6 Downloading monitor data
Installation method of the monitor data is shown below:
Click the [Communication] [Communicate with GOT].
The setting dialog box appears. Refer to the following descriptions for setting.
After setting, click the Download button to start installation.
Communicate with GOT dialog box (Download GOT tab)
Item Description A F
Project configuration tree
The project configuration tree is displayed. Check the desired item for downloading.
Right click the mouse to "Select All" or "Unselect".
Delete all old monitor data
After deleting the monitor data already downloaded to the GOT, this is checked to
download this monitor data.
Project ID Project ID is displayed.
Available size
When the built-in memory information has the memory information of the GOT, the
available size for a user is displayed.
Check OS version of GOT
Check this to check the basic OS version of the GT Designer2 and the basic OS version
installed on the GOT.
If the basic OS version installed on the GOT is older than the GT Designer2 OS version,
a message to prompt reinstallation of the OS appears in downloading.
Memory meter
When the built-in memory information has the memory information of the GOT, the
available size for the user is displayed as a meter.
Transfer size Size of the monitor data selected in the project configuration tree is displayed.