Emerson 300510EN Yogurt Maker User Manual


 
System Configuration Manual
300510EN, Rev AA
December 2010
5-95
Rosemount Raptor
Section 5. Installing a Raptor Level Gauging System
5.10.2 Installing a 5300
Using the
Installation
Wizard
The installation wizard in TankMaster WinSetup is a tool that may be used to
install and configure a Rosemount 5300 Guided Wave Radar and other
devices.
However, in most cases the following procedure is recommended when
installing a new Rosemount 5300:
1. Configure the Rosemount 2160 FCU Slave Database by including the
new 5300. Ensure that the correct Modbus address is configured (see
“Installing a Rosemount 2160 FCU” on page 5-25 for more information).
2. Configure the Rosemount 2410 Tank Database in the 2410 Tank Hub
Properties/Tank Database window, (see “Installing a Rosemount 2410
Tank Hub” on page 5-38 for more information).
3. Install the 5300 in TankMaster via the 2410 Tank Hub Properties/Device
Tags window.
4. Configure the 5300 (see “Configuration via 5300 Properties” on
page 5-91).
See also “Adding a Tank to a Raptor System” on page 5-114 for further
information on adding tanks and devices to a Raptor system.
In case the recommended installation procedure can not be used, the
installation wizard offers an alternative method to install a new Rosemount
5300 Guided Wave Radar in TankMaster. In this case do the following:
1. Configure the Rosemount 2160 FCU Slave Database by including the
new 5300 radar. Ensure that the right Modbus address is configured (see
“Installing a Rosemount 2160 FCU” on page 5-25 for more information).
2. Configure the Rosemount 2410 Tank Database in the 2410 Tank Hub
Properties/Tank Database window, (see “Installing a Rosemount 2410
Tank Hub” on page 5-38 for more information).
3. Install and configure the Rosemount 5300 as described in “Using the
installation wizard” on page 5-96.