System Configuration Manual
300510EN, Rev AA
December 2010
Rosemount Raptor
5-116
Section 5. Installing a Raptor Level Gauging System
7. Configure the Slave Database with Modbus addresses for the new level
gauge and ATD devices, see “Installing a Rosemount 2160 FCU” on
page 5-25 for more information.
8. Install and configure a Rosemount 2410 Tank Hub and the field devices
connected to the Tankbus as described in “Installing a Rosemount 2410
Tank Hub” on page 5-38.
9. Install a tank and associate the new 2410 to the tank as described in
“Installing a Tank” on page 5-101.
Now the new tank and field devices are installed and configured and will
appear in the TankMaster workspace.